US$ 164.53
Pay in 4 interest-free payments of $6.99 Learn more
and a heavy die-cast frame for massive pulling power
This kit contains 119 parts in 7 different colours and a detailed building instruction sheet
Fifty Class 90 locomotives were ordered by British Rail in 1986 to replace the ageing Class 85 fleet on West Coast Main Line duties
142 and 155 diesel multiple units
This was the last British Armoured Division to re-equip in preparation for the D-Day invasion of Normandy
928007 SECR Dia. 1744 2 plank No. 62466, SR red oxide (late) Class_Class 158 and a heavy die-cast frameRapido Trains UK unveils the first ready to run pre Grouping ballast wagon in OO. The SECR used its standard 9ft 6in wheelbase steel underframe for a two plank ballast wagon that was introduced in 1919. Some 120 were built over the next four years, the last being completed by the Southern. These wagons were often seen in long rakes as they took ballast to wherever trackwork required attention. They were so useful that BR didnt finally get rid of the
US$ 164.53
US$ 159.43
US$ 28.00
US$ 149.50
US$ 59.95
US$ 129.00
US$ 12392.00
US$ 3960.00
US$ 26.00
US$ 25.00
US$ 26.00